Project Overview

Millnest was engaged by PT Rubyndo, Indonesia, to provide comprehensive engineering consultancy for the development of a 50,000 Metric Tons Per Annum (MTPA) Desiccated Coconut Grinding Plant.

The assignment covered the complete project lifecycle, including concept development, engineering support, plant planning, equipment selection, layout optimization, vendor coordination, installation guidance, and commissioning assistance.

The consultancy was successfully completed, and the project was handed over for commercial operation.


Client Profile

PT Rubyndo is an Indonesian agro-commodity company engaged in the processing and export of coconut-based products and other agricultural commodities for international markets. The company operates processing facilities focused on producing high-quality desiccated coconut and related products.

Scope of Consultancy

Millnest delivered complete engineering consultancy covering every major stage of project development, including:

  • Project feasibility review
  • Process flow development
  • Plant capacity planning
  • Equipment sizing and selection
  • Process engineering
  • Utility planning
  • Plant layout optimization
  • Material flow planning
  • Vendor technical evaluation
  • Procurement support
  • Installation supervision
  • Commissioning assistance
  • Production readiness support

Engineering Challenges

The project required careful engineering to achieve multiple operational objectives simultaneously:

  • Designing for high production capacity
  • Supporting continuous plant operation
  • Maintaining hygienic food processing standards
  • Developing efficient material handling systems
  • Allowing for future capacity expansion
  • Incorporating energy-efficient process design
  • Optimizing equipment arrangement
  • Minimizing internal material movement throughout the plant

Millnest Engineering Solution

Millnest developed an integrated engineering solution focused on operational efficiency, maintainability, and long-term scalability.

The consultancy emphasized:

  • Optimized process layout
  • Smooth raw material movement
  • Efficient grinding process configuration
  • Utility integration
  • Equipment selection based on production requirements
  • Space optimization
  • Simplified maintenance access
  • Improved workflow between processing sections

Consultancy Deliverables

Millnest provided a complete set of engineering deliverables, including:

  • Process Flow Diagram (PFD)
  • Plant Layout
  • Equipment Layout
  • Utility Planning
  • Technical Specifications
  • Equipment Selection Recommendations
  • Procurement Support
  • Installation Guidelines
  • Commissioning Support
  • Technical Documentation

Project Outcome

The consultancy enabled the successful execution of the project through:

  • Successful completion of engineering activities
  • Streamlined plant layout
  • Optimized process flow
  • Efficient equipment integration
  • Commissioning support leading to operational readiness

No quantitative performance claims are included because project records are unavailable.


Project Highlights

ParameterDetails
ClientPT Rubyndo
CountryIndonesia
IndustryFood Processing
ProductDesiccated Coconut
Plant Capacity50,000 MTPA
ServiceEnd-to-End Project Consultancy
StatusSuccessfully Completed
Share this Case Study

Explore More Case Studies